Progress reports
The Geological Survey of Victoria has released a series of progress reports for the Victorian Gas Program, detailing the progress to date on:
- delivering scientific, technical and environmental studies necessary to better understand the risks, benefits and impacts of onshore conventional gas
- supporting offshore gas exploration with geoscience
- investigating the opportunities for further underground gas storage
- supporting the work programs for onshore conventional gas and offshore gas including community engagement, resource planning and regulatory review.
The progress reports provide a comprehensive overview of the program and an update on the various scientific activities that have been carried out so far.
Five reports have been released to date.
Progress Report #5 – December 2020
Progress Report #4 – March 2020
Documents updated April 2020.
Errata list for PDF documents:
Page | Section | Item |
---|---|---|
Page 46 | Table 4.7 | Revised ‘0.45 per cent’ to ‘0.02 per cent’ |
Page 46 | Table 4.7 | Revised ‘1.71 per cent’ to ‘0.04 per cent’ |
Page 47 | Table 4.7 | After ‘…(a total of $6,710.66 million over the lifetime of production). |
Page 47 | Table 4.7 | Revised |
Page 57 | Table 4.10 | Revised ‘0.07 per cent’ to ‘0.00 per cent’ |
Page 57 | Table 4.10 | Revised ‘0.33 per cent’ to ‘0.01 per cent’ |
Page 57 | Table 4.10 | After ‘…(a total of $823.9 million over the lifetime of production).’ |
Page 57 | Table 4.10 | Revised |
Progress Report #3 – October 2019
Progress Report #2 – February 2019
Documents updated April 2019.
Errata list for PDF documents:
Page | Section | Item |
---|---|---|
Page 2 | Figures | Revised ‘Figure 2.26: An example of methane concentrations’ to ‘Figure 2.26: Methane/Ethane enhancement ratio for atmospheric methane sources in the Gippsland Basin’. |
Page 2 | Figures | Revised ‘Figure 2.27: An example of methane concentrations above background in south-west Victoria’ to ‘Figure 2.27: Schematic conceptual diagram of Southwest Region Groundwater Model’. |
Page 2 | Figures | Removed ‘Figure 2.28: Schematic conceptual diagram of Southwest Region Groundwater Model’. |
Page 33 | Beneath line 1 from bottom | Removed figure 2.26 and caption ‘Figure 2.26: An example of methane concentrations’. |
Page 34 | Line 1 from top | Removed ‘(Figure 2.27)’. |
Page 35 | Line 1 from bottom | Revised ‘Figure 2.28’ to ‘Figure 2.27’. |
Page 35 | Figure caption | Revised caption ‘Figure 2.28: Schematic conceptual diagram of Southwest Region Groundwater Model’ to ‘Figure 2.27: Schematic conceptual diagram of Southwest Region Groundwater Model’. |
Progress Report #1 – January 2018
Errata list
- Page 4, line 13 from bottom, changed '556' to '554'
- Page 34, line 7 from top, changed '556' to '554'
Please note that a progress report may draw on information from, or refer to, a technical study that has not yet been published. All Victorian Gas Program technical studies will be published online once completed.
Contact us
- P: 136 186
- E: vgp@deeca.vic.gov.au
- By post: Department of Energy, Environment and Climate Action
Attention: Earth Resources Community Engagement Team
GPO Box 4509
Melbourne VIC 3001